The business case for leaving public cloud usually compares an invoice to a hardware quote. Both sides leave costs out, and some of the missing ones favor staying where you are.

It makes sense when the workload is steady, you understand it well, it moves a lot of data, and you already have people who can run infrastructure. Outside of that, the case gets weak quickly. I say this as someone who has spent more than 20 years in enterprise infrastructure and likes owning hardware.

Most of the business cases I have seen for leaving public cloud compare a monthly invoice to a hardware quote. Both sides of that comparison are missing things, and the missing things do not all point the same way.

Start with what people leave off the cloud side, because leaving it off makes the cloud look cheaper than it is.

Data transfer is the usual one. Compute and storage get estimated carefully, and traffic leaving the provider, or crossing zones and regions inside it, gets a guess. Paid support plans are another. Then there is everything you provisioned for a peak and never scaled down, and the managed services (databases, queues, load balancers) that were added one at a time and never appeared in the original estimate. If you want a fair number for what the workload costs in the cloud, take it from the bill, by tag and usage type. The architecture diagram will not give it to you.

The omissions on the on-premises side are bigger.

People. A hardware quote does not include the engineers who patch firmware, replace failed drives, run the platform and get paged at night. If those people already exist and have capacity, the marginal cost is small. If they do not, hiring them is the largest line in the plan, and it is the one most often left out.

The second site. A cloud region usually gives you several zones to spread across. On premises, comparable availability means a second location, replication between the two, and spare capacity in each. One room with one set of servers is cheaper than the cloud for the same reason a car without brakes is cheaper.

Headroom. In the cloud you pay for what you run. On your own hardware you buy for the peak, plus growth, plus enough spare to lose a host and keep working. A fleet that averages half utilized is normal, and the idle half is on your books.

Facilities. Power, cooling and space cost money every month, and new power in particular takes time to get. If your existing rooms have spare capacity, good. If they do not, the project has just acquired a dependency on a utility or a colocation contract.

Refresh. The hardware quote is a purchase you will repeat. Servers age out of support, and the migration to the next generation is a project with its own cost.

The move itself. Engineers who are migrating are not building anything else. For a while you pay for both environments. And anything built on a provider's managed services has to be rebuilt on something you operate, which is where most of the real work hides.

That last point deserves a plain statement. A workload that is a set of virtual machines and a database you run yourself can move. A workload assembled from a provider's managed database, queueing, identity and serverless functions is a rewrite. Moving the first kind is an infrastructure project, while the second is a software project with an infrastructure project attached, and it needs its own business case.

There are also costs that favor staying, and an honest comparison counts them.

Elasticity is worth money if you use it. A workload that triples for a week each quarter, or that might be gone in a year, fits rented capacity. Buying hardware for it means owning the peak all year.

Commitments you have already signed are a cost of leaving. Providers discount in exchange for usage commitments. AWS describes its Savings Plans in those terms: lower rates in exchange for committing to a specified amount of compute for a one or three year period. If you have two years left on a commitment, you pay it whether the workload is there or not.

Speed counts too. A team that can get a new environment in an afternoon will not thank you for a procurement cycle. If your internal platform cannot offer something close, you have moved the cost from the invoice to the calendar.

One cost that used to block exits has mostly gone away. The fee to transfer your data out was a real deterrent. Google announced in January 2024 that customers leaving its cloud could move their data out without paying network transfer fees. AWS followed in March 2024 with a similar waiver, saying it "follows the direction set by the European Data Act." Both require you to ask and both have conditions, so read the current terms. The Data Act itself entered into force on January 11 2024 and has applied since September 12 2025, and it includes rules on switching between providers of data processing services. What blocks a move now is the engineering.

Here is how I would decide, one workload at a time.

Look at the utilization curve first. A flat, predictable curve favors owning, and a spiky or uncertain one favors renting.

Look at the data. If the workload reads and writes a large data set that already lives on premises, or ships large volumes out of the cloud every month, the transfer charges and the latency both pull it toward where the data is.

Look at what it is made of. Count the managed services. Each one is something you will have to replace and then operate.

Look at who will run it. Name the team. If you cannot, stop there.

Look at the time horizon. Owning pays back over years. If nobody can say the workload will exist in its current shape three years from now, the payback is a guess.

Signs that a workload favors owning or renting
Favors owning

Flat, predictable utilization

Virtual machines and a database you run yourself

A named team that will run it

Expected to exist in its current shape in three years

Favors renting

Spiky or uncertain utilization

Assembled from the provider's managed services

No team you can name

Might be gone in a year

A hardware quote leaves out people, the second site, headroom, facilities, refresh and the move itself.

Then draw the ownership line, because it moves. In the cloud, the provider owns the hardware, the facility and a good part of the platform, and you own what you build on top. When you bring a workload home, all of that becomes yours, including the 2 a.m. part. That can be the right trade if you make it knowing what you are taking on.

One caveat. I am not arguing that cloud is expensive or that on premises is cheap. Each is true for some workloads and false for others, and a slogan applied to the whole estate will be wrong for most of what you run.

To test your own case, pick one candidate, the steadiest workload you have, and write down both columns in full, including people, the second site and the remaining commitment. Do that before anyone asks a supplier for a hardware quote, because the quote tends to become the business case once it exists.